Blog Archives

DIAGNOSIS OF “7-Step Approach” of FMEA:  As per first edition of FMEA HANDBOOK

DIAGNOSIS OF “7-Step Approach” of FMEA: As per first edition of FMEA HANDBOOK

Posted on: January 2nd, 2020  /  By:  /  Posted in: #QUALiTYViVA, FMEA, FMEA HANDBOOK, IATF, IATF16949  /  Comment: 0

The most important part is execution of FMEA and same is based on “7-Step Approach”, the steps are: Step 1:Planning & Preparation,Step 2:Structure Analysis,Step 3:Function Analysis,Step 4:Failure Analysis,Step 5:Risk Analysis,Step 6:Optimization, andStep 7: Results Documentation. The above seven steps approach is categorised into three phases and are System Analysis, Failure Analysis and Risk Mitigation Risk […]

Read more
New Automotive FMEA Handbook: 10 basic things

New Automotive FMEA Handbook: 10 basic things

Posted on: December 6th, 2019  /  By:  /  Posted in: #QUALiTYViVA, FMEA, FMEA HANDBOOK, IATF, IATF16949  /  Comment: 0

The highlights and 10 basic things about “New Automotive FMEA Handbook” are: AIAG- Automotive Industry Action Group (AIAG)VDA – Verband der Automobilindustrie (German Association of the Automotive Industry)AIAG and VDA have collaborated and harmonized their earlier Failure Mode and Effects Analysis (FMEA) Manual and published this first international guide.So, this is AIAG & VDA FMEA […]

Read more
How to Make Turtle Diagram for Health and Safety?

How to Make Turtle Diagram for Health and Safety?

Posted on: April 15th, 2018  /  By:  /  Posted in: #QUALiTYViVA, IATF, IATF16949, IMS, ISO, ISO 9001:2015, ISO/IEC 17025:2017, ISO45001, lean, QMS, Quality, Safety, Safety , OHSAS OH&S, Turtle Diagram, ZED  /  Comment: 0

It’s inspiring, one search on 04.04.2018 I found on my blog regarding “How to Make Turtle Diagram for Health and Safety”? Today’s article is on the same topic and dedicated to that searcher on net. So, we start like this, What is Turtle Diagram? A Turtle Diagram is a quality tool for visual representation of […]

Read more
Takeaways from IATF16949:2016

Takeaways from IATF16949:2016

Posted on: April 1st, 2018  /  By:  /  Posted in: #QUALiTYViVA, IATF, IATF16949, IMS, ISO, Mandatory Documents, Mandatory Records, QMS, Quality  /  Comment: 0

While going through and reading the IATF, points are noted and the collections of these points are found to be useful as a bird eye view or can be called as takeaways. Same are furnishing here with, hope may be useful: Group of major car manufacturer crafted the IATF. IATF 16949 and ISO 9001 to […]

Read more
FMEA (Failure Mode and Effect Analysis)

FMEA (Failure Mode and Effect Analysis)

Posted on: March 28th, 2018  /  By:  /  Posted in: #QUALiTYViVA, CTQ, IATF, IATF16949, ISO, ISO 9001:2015, ISO/IEC 17025:2017, ISO45001, lean, QMS, Quality, Quality Circle, Safety, Safety , OHSAS OH&S, VOC  /  Comment: 0

FMEA is a tool to reduce the risk. This tool use in Six Sigma as part of Improve Phase. How to choose FMEA topic? Choose topic base on following: Critical to Quality(CTQ) Voice of Customer(VOC) Customer complaint Diversion Pareto diagram Risk analysis Formula for RPN (Risk Priority Number): RPN = Severity X Occurrence X Detection […]

Read more
DIAGNOSIS OF REQUIREMENT OF RISK BASE THINKING IN ISO 9001:2015 AND IATF 16949:2016

DIAGNOSIS OF REQUIREMENT OF RISK BASE THINKING IN ISO 9001:2015 AND IATF 16949:2016

Posted on: February 2nd, 2018  /  By:  /  Posted in: #QUALiTYViVA, IATF, IATF16949, ISO, ISO 9001:2015, Quality, Risk, RISKBASETHINKING  /  Comment: 0

We can find lots of literature on the risk base thinking, risk management and many other related to risk, but here we diagnose and understand requirement , related and interrelated clause of risk base thinking with respect to ISO 9001:2015 and IATF16949:2016 in simplified and lucid way What is Risk? Risk is, Effect of uncertainty […]

Read more
Diagnosis of IATF 16949:2016 clause – 7.1.5.1.1 Measurement System Analysis (MSA)

Diagnosis of IATF 16949:2016 clause – 7.1.5.1.1 Measurement System Analysis (MSA)

Posted on: December 23rd, 2017  /  By:  /  Posted in: #QUALiTYViVA, IATF, IATF16949, Measurement System Analysis, MSA  /  Comment: 1

Clause – 7.1.5.1.1 Measurement System Analysis Statistical study shall be conducted to analyse the variation present in the result of each type of inspection, measurement, and test equipment system identified in the control plan. The analytical method and acceptance criteria used shall conform to those in reference manual on measurement system analysis. Other analytical method […]

Read more
Diagnosis of IATF 16949:2016 clause – 8.7.1.5 Control of repaired products

Diagnosis of IATF 16949:2016 clause – 8.7.1.5 Control of repaired products

Posted on: November 4th, 2017  /  By:  /  Posted in: #QUALiTYViVA, Control of repaired products, IATF, IATF16949, ISO, Repair, Rework, Rework and Repair  /  Comment: 3

Clause 8.7.1.5 – Control of repaired products The organization shall utilize risk analysis (such as FMEA) methodology to assess risk in the repair process prior to a decision to repair the product. The organization shall obtain approval from the customer before to commencing repair of the product. The organization shall have a documented process for […]

Read more
Diagnosis of IATF 16949:2016 clause – 8.7.1.4 Control of reworked products

Diagnosis of IATF 16949:2016 clause – 8.7.1.4 Control of reworked products

Posted on: November 3rd, 2017  /  By:  /  Posted in: IATF, IATF16949, ISO, Quality, Repair, Rework, Rework and Repair  /  Comment: 0

Clause 8.7.1.4 – Control of reworked products The organization shall utilize risk analysis (such as FMEA) methodology to assess risk in the rework process prior to a decision to rework the product. If required by the customer, the organization shall obtain approval from the customer prior to commencing rework of the product. The organization shall […]

Read more
Road Map for ISO (IMS) /IATF Certification

Road Map for ISO (IMS) /IATF Certification

Posted on: September 14th, 2017  /  By:  /  Posted in: IATF, IMS, ISO, QMS  /  Comment: 2

There is change over from old version of ISO to new version and it’s time to start on time to catch last date 14th September 2018. This has been understood that there is every support and commitment of management is required where implementation of ISO has to be carried out , this is very first […]

Read more

Recent Post

Archives

Categories